116、A company wants to start a new product line.The following activities were identified by the project.
Activity D was delayed due to the unavailability of a raw material.How many days of delay could the project manager absorb without delaying the project?
A.20 days
B.10 days
C.15 days
D.0 days
116、一家公司希望開始一個(gè)新的產(chǎn)品線。項(xiàng)目經(jīng)理確定了下列活動(dòng)。
由于原材料短缺,活動(dòng)D延期。在不造成項(xiàng)目延期的情況下,項(xiàng)目經(jīng)理可以接受該活動(dòng)延期多少天
A.20天
B.10天
C.15天
D.0天
117、The procurement management plan includes which of the following document?
A.Types of contracts used.
B.Statement of Work
C.Procurement document package
D.Contract
117、采購管理計(jì)劃中包含下列哪份文件
A.使用的合同類型
B.工作說明書
C.采購文件包
D.合同
118、The cumulative CPI has been shown to be relatively stable after what percentage of project completion?
A.5%to 10%
B.15%to 20%
C.25%to 35%
D.50%to 75%
118、多大比例的項(xiàng)目工作完成后,其累計(jì)CPI會(huì)保持相對(duì)穩(wěn)定
A.5%到10%
B.15%到20%
C.25%到35%
D.50%到75%
119、A manager and the head of engineering discuss a change to a major work package.After the meeting,the manager contacts you and tells you to complete the paperwork to make the change.This is an example of:
A.management attention to scope management.
B.management planning.
C.a project expediter position.
D.a change control system.
119、經(jīng)理和工程部門主管正在討論某一重要工作包的變更事宜。會(huì)議之后,經(jīng)理聯(lián)系你并要求你把變更內(nèi)容寫成書面文件,這是以下哪項(xiàng)的例子
A.關(guān)注范圍管理
B.項(xiàng)目管理計(jì)劃
C.項(xiàng)目聯(lián)絡(luò)員職位
D.變更控制系統(tǒng)
120、Which analysis technique is used to determine the basic underlying reason for a variance,defect or risk?
A.Root cause analysis
B.Schedule baseline analysis
C.Cost variance analysis
D.Problem analysis
120、若要確定偏差、缺陷或風(fēng)險(xiǎn)的基本潛在原因,應(yīng)使用下列哪一項(xiàng)分析技術(shù)
A.根本原因分析
B.進(jìn)度基準(zhǔn)分析
C.成本偏差分析
D.問題分析
PMP備考每日試題(211201)點(diǎn)擊跳轉(zhuǎn)
(211201)答案
111、A
112、A
113、C
114、D
115、D

PDMA-NPDP?新產(chǎn)品開發(fā)專業(yè)人士認(rèn)證
PMI-PgMP?國際項(xiàng)目集管理認(rèn)證
PMI-PMP?國際項(xiàng)目管理認(rèn)證
信息系統(tǒng)項(xiàng)目管理師(軟考高項(xiàng))認(rèn)證
系統(tǒng)集成項(xiàng)目管理工程師(軟考中項(xiàng))認(rèn)證
項(xiàng)目管理專業(yè)人員能力評(píng)價(jià)(CSPM)
PMI-ACP?國際敏捷項(xiàng)目管理認(rèn)證
信息技術(shù)應(yīng)用創(chuàng)新人才評(píng)價(jià)(信創(chuàng)證書)