6、制定項(xiàng)目范圍說明書后,團(tuán)隊(duì)已準(zhǔn)備好繼續(xù)進(jìn)行其他項(xiàng)目活動(dòng),團(tuán)隊(duì)成員要求項(xiàng)目經(jīng)理對后續(xù)的活動(dòng)和成果提供指導(dǎo)。項(xiàng)目經(jīng)理接下來應(yīng)該怎么做?
A、列出限制團(tuán)隊(duì)更新項(xiàng)目范圍的制約因素
B、收集需求,創(chuàng)建需求跟蹤矩陣
C、將活動(dòng)清單排序,估算活動(dòng)資源
D、審查之前項(xiàng)目的政策、程序和經(jīng)驗(yàn)教訓(xùn),創(chuàng)建工作分解結(jié)構(gòu)
7、A project manager leads a product development project.The product passes testing,and the final version will be released to the client.Before the release date,the client discovers that a critical issue must be fixed in the final release.The client agrees to pay for the fix caused by a flaw in the client's product design.What should the project manager do first?
項(xiàng)目經(jīng)理管理一個(gè)產(chǎn)品開發(fā)項(xiàng)目。產(chǎn)品通過測試,且最終版本將向客戶發(fā)布。發(fā)布日期前,客戶發(fā)現(xiàn)在最終發(fā)布版本中必須修復(fù)一個(gè)關(guān)鍵問題。客戶同意支付由于客戶產(chǎn)品設(shè)計(jì)缺陷引起的修復(fù)費(fèi)用。項(xiàng)目經(jīng)理首先應(yīng)該怎么做?
A、Decline the client's request and suggest fixing it in a later's version拒絕客戶的請求,并建議在后續(xù)版本中修改這個(gè)問題吧
B、Meet with the change control board to approve the change與變更控制委員會(huì)開會(huì),批準(zhǔn)該變更
C、Conduct a meeting with the sponsor to assess the imp act of the change與發(fā)起人開會(huì)評估變更的影響
D、Prepare a change request form that details the fix準(zhǔn)備變更請求表,詳細(xì)說明修復(fù)問題
8、A project manager receives a chain of e-mails from the project team and vendor,arguing about a recently received deliver able.The project team believes that the deliverable fails to meet a specific requirement,but the vendor maintains they are unaware of this requirement.To what should the project manager first refer?
項(xiàng)目經(jīng)理從項(xiàng)目團(tuán)隊(duì)和供應(yīng)商處收到一連串電子郵件.爭論最近收到的一個(gè)可交付成果。項(xiàng)目團(tuán)隊(duì)認(rèn)為該可交付成果未能滿足特定需求,但供應(yīng)商卻堅(jiān)持他們不知道這個(gè)需求。項(xiàng)目經(jīng)理首先應(yīng)該查閱哪份文件?
A、Requirements management plan.需求管理計(jì)劃。
B、Work Breakdown structure(WBS).工作分解結(jié)構(gòu)(WBS)
C、Communication management plan.溝通管理計(jì)劃。
D、Statement of works(SOW).工作說明書(SOW)
9、組織來購部和法務(wù)部的人員將參與項(xiàng)目的采購工作,有關(guān)他們在采購中的角色和職責(zé)的安排應(yīng)該寫入哪個(gè)文件中?()
A、相關(guān)方登記冊
B、采購策略
C、合同
D、采購管理計(jì)劃
10、A project manager facilitates a workshop with stakeholders t o gather product requirements and develop a requirements traceability matrix.The system developer was unable to attend the workshop,but requested a copy of the minutes to review and validate the output.The system developer then provides feedback that the listed functional requirements do not make sense when competed against the user requirements.What should the project manager do to address this?
A.Advice the system developer to attend the next review meeting.
B.Inform the system developer to review the requirements with users.
C.Update the requirements traceability matrix to include the relevant relationships of the requirements.
D.Ask the system developer to submit a change request.
項(xiàng)目經(jīng)理與相關(guān)方一起召開一次引導(dǎo)式研討會(huì),以收集產(chǎn)品需求并制定需求跟蹤矩陣。系統(tǒng)開發(fā)人員無法參加該研討會(huì),但請求一份會(huì)議記錄以審查和確認(rèn)輸出,然后系統(tǒng)開發(fā)人員提供反饋,說明列出的功能需求在與用戶需求競爭時(shí)沒有意義。若要解決這種情況,項(xiàng)目經(jīng)理應(yīng)該怎么做?
A、建議系統(tǒng)開發(fā)人員參與下次審查會(huì)議
B、通知系統(tǒng)開發(fā)人員與用戶一起審查需求
C、更新需求跟蹤矩陣以包含需求的相關(guān)關(guān)系
D、要求系統(tǒng)開發(fā)人員提交變更請求
PMP備考每日試題(221109)點(diǎn)擊跳轉(zhuǎn)
(221109)答案
1、C
2、C
3、C
4、D
5、D

PDMA-NPDP?新產(chǎn)品開發(fā)專業(yè)人士認(rèn)證
PMI-PgMP?國際項(xiàng)目集管理認(rèn)證
PMI-PMP?國際項(xiàng)目管理認(rèn)證
信息系統(tǒng)項(xiàng)目管理師(軟考高項(xiàng))認(rèn)證
系統(tǒng)集成項(xiàng)目管理工程師(軟考中項(xiàng))認(rèn)證
項(xiàng)目管理專業(yè)人員能力評價(jià)(CSPM)
PMI-ACP?國際敏捷項(xiàng)目管理認(rèn)證
信息技術(shù)應(yīng)用創(chuàng)新人才評價(jià)(信創(chuàng)證書)